Skip to content
OEM / ODM EV connection systemsEngineering reply within 1 business day
English
EnglishEN中文ZHDeutschDEFrançaisFREspañolESBahasa IndonesiaIDالعربيةAR
Start an RFQ
Menu
Site power management

Dynamic load balancing

A site-power management version that adjusts charging current against measured building demand so the installation stays within an agreed electrical limit.

04Working pathProgram output
Core buyer challenge

Choose DLB when available building capacity changes during the day or an expensive supply upgrade should be avoided. DLB manages power; it does not replace APP user control, RFID authorization or OCPP operations.

Request support
Program output

A defined scope technical and sourcing teams can use.

01

What this version adds

A compatible meter or current sensor, communications path, allocation logic and safe fallback behaviour.

02

Best applications

Homes with limited service capacity, workplaces, apartment parking and sites adding one or more chargers.

03

How it differs

Unlike a fixed current limit, DLB reacts to other building loads; unlike OCPP, its primary role is electrical capacity control rather than commercial operations.

04

Confirm before ordering

Single or three phase supply, meter model and location, charger count, wiring distance, communications, minimum current, priority rules and failure mode.

Working path

Four gates keep commercial speed aligned with engineering control.

  1. 01

    Survey the electrical site

    Record supply rating, phases, existing peak demand, charger count and future expansion.

  2. 02

    Select the system boundary

    Confirm the compatible meter or sensors, charger controller, wiring and communications topology.

  3. 03

    Commission the rules

    Test normal load, peak load, minimum current, meter loss, communication loss and recovery.

  4. 04

    Handover settings

    Document limits, device addresses, installation points and service checks for the site operator.